ProBina

Group Member :
'Abiddin
Saidatul Ummah
Nadia Asyilla
Syarifah Zainoriah
Aminnur Hayati





General Meeting for Infrastructure Development :



- designing are based on IWK standard for wet and dry market.
- equivalent population (EP) were calculated first to estimate the design capacity for the sewerage system.

- the location of man holes were determined based on the condition and strategic location that will not disturbed the public access.